Global Drilling Operation Restores Severely Paraffin-Obstructed Drill Pipe in Single Pass
A large international drilling operation in South America faced persistent challenges caused by severe paraffin wax buildup inside drill pipe – a significant operational and capital asset, processing up to 600 drill pipes per day. R&R Manufacturing deployed the SuperMax Tubular Cleaning Unit with a 20,000 PSI high-pressure water blasting package to support inspection-ready cleaning under severe paraffin buildup conditions.